It is a replacement for legacy train protection systems and designed to replace the many incompatible safety systems currently used by European railways. These new tools and capability will allow colleagues to carry out ‘predict and prevent’ maintenance and introduce more effective workload planning.The European Train Control System ( ETCS) is the signalling and control component of the European Rail Traffic Management System (ERTMS). Scheduleit – planning from two years out, right up to the day before works commence.Planit – long-term asset workbank planning.Digitised Lineside Inspections (DLI) – a desktop alternative to walking the track to identify vegetation encroachment.Geotechnical Asset Insights application (GAIA) – consolidating geotechnical asset data, weather data, and work plans – helping teams manage risk and prioritise safety.Web Tunnel Condition Marking Index (WebTCMI) – capturing and managing tunnel surveys and assessment data.Network Enterprise Structures and Tunnels System (NEST) – all structure asset information in one place.National Relay Database – bringing together all signalling relay data.myinfrastructuremanager – easier to raise, track and close failures.myworkmanager – easier to manage work orders.mywork – easier to complete work orders.Strategy Engineering and Asset Management Systems (StrEAMS) – all drainage data in one place.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |